TACC Signs Massive MoU with Global OEM for Fast-Charging EV Anode Supply 

Advertisement
TACC Signs Massive MoU with Global OEM for Fast-Charging EV Anode Supply  Featured Image

Author:
Jas Chellani

Published on:
November 16, 2026

Categories:
EV News & Trends

Tags:
TACC MoU

Advertisement

TACC Limited has entered into a non-binding MoU with a global automotive OEM in order to supply fast charging anode materials, with a potential agreement covering up to 10% of its Phase 1 capacity of 20,000 MT annually. 

This strategic partnership will be focussing towards long-term supply of synthetic graphite anode, on which India can rely on, thus leading the next-generation of lithium-ion cell manufacturing. 

Advertisement

The 40,000-Tonne Mega Deal 

This will be a big project as MoU mentions a proposed long-term supply agreement of up to 40,000 tonnes of synthetic graphite-based Anode Active Material (AAM). Thus anode materials are the ultimate core component of any lithium-ion cell. 

TACC Signs MoU with Global OEM

As the global partner is scaling up cell manufacturing capacities, TACC will be actively ramping up in order to meet the massive demand. While the MoU is non-binding and limited to financial, commercial and technical discussions, it will set big standards for Indian material suppliers on an international level. 

Fast-Charging

Nobody wants to stand in long queues at a charging station. That’s why this partnership will be expanded beyond material supply including heavy emphasis on joint Research and Development (R&D). 

The strategic alliance between TACC and global OEM will be aiming towards co-developing customisable, advanced anode formulations which will be specifically designed to unlock faster charging capabilities and higher energy density. 

The MD and CEO of TACC Limited, Ankur Khaitan has expressed that this partnership will be executing process via innovative methods, ensuring that synthetic graphite is able to meet the rising demands of global cell manufacturers. 

TACC Signs MoU with Global OEM

The 'Make in India' Backbone: A ₹2,350 Crore Vision 

It is not possible to supply 40,000 tonnes of highly specialised material without a developed infrastructure. Thus TACC is building a massive facility which will be distributed across 100 acres in the Sisodia Industrial Area situated in Dewas, Madhya Pradesh. 

  • Phase 1 Capacity: 20,000 Metris Tonnes per Annum (MTPA), designed for commissioning by June 2027. 
  • Future Expansion: It will be expanding up to 44,000 MTPA in order to complete volumes proposed in the new MoU. 
  • Government Backing: In order to make the deal impressive, TACC has secured Rs 609.50 crore investment under the Ministry of Electronics and Information Technology’s (MeitY) and Electronics Component Manufacturing Scheme (ECMS)

The government is also providing support by significantly de-risks the Rs 2,350 crores Phase 1 investment and will be enhancing India’s ability to localize the EV supply chain. The Chairman of TACC, Riju Jhunjhunwala has expressed that localised production is very crucial for building a competitive and developed energy storage supply chain.

Also check: Madhya Pradesh EV Subsidy 2026 Explained | Complete Benefits

Advertisement

Subscribe to our Newsletter